I have multiple compute resources that are tied to the same fabric group and some allow me to set the cost profile and others don't, they just say automatic. I have read the documentation and it says that as long as I'm a fabric admin i should be able to change that, is there something else i am missing? I am running vRA 6.2.2
↧