Hello,
After upgrading to vra 7.2 the max lease date is now actually enforced, which is great. We were finding a lot of our end users where setting the lease to never expire! However, there are some circumstances where we may want to extend a lease beyond the maximum. As an administrator I should be able to do that even if the end user cannot. Does anyone know of a way to change leases beyond what the blueprint constraints are on a case by case basis?
Thanks,
Darrenoid