Has anyone used the vRA migration tool to go from exisiting production vra6.2 to a new production vra7.1?, described here vRealize Automation 7.1 Information Center
It's basically seems a IAAS SQL database copy.
Questions
1. Does anyone have feedback on how easy this was for them.
2. There's no mention of copying the Postgress DB so i assume will need to do stuff like re-registering the VMs in vRA. What other problems could there be with a install only Postgres DB.
3. It will copy over the blueprints as in IAAS (SQL) but in vRA7 blueprints in CAFE so I assume I will have to recreate all blueprints.
4. vRA7 destination must be blank of all objects like network profiles etc.
Thanks, all feedback appreciated.
I'm doing it to a DEV 7 install first to try to find issues, also when I search for posts/blogs on the side by side migration there seems very little information.
Thanks
Chris