Hello,
Since our update to vRA 6.2.1 we are wondering about the behavior of Concurrent Provisioning Operations.
We use the default value of 2 for “MaxOutstandingResourceIntensiveWorkItems”.
But the only thing that is limited to two is the vCenter Clone itself.
We use full vCenter Clones with vCO Stub’s for Building und Provisioned Machine.
My wish is to have a Limit for the whole provisioning chain (vCO Stub – Template Clone – vCO Stub). Is there may be a Bug, or is that the expected behavior?
There is also a group Blog Post from Jad about these setting:
http://www.virtualjad.com/2015/07/increasing-vra-concurrent-provisioning.html